Sale!

A model-View-Controller Based Platform for the Modeling and Simulation of the Hoist Scheduling Problem

3,000.00

If you are interested in getting this project material A model-View-Controller Based Platform for the Modeling and Simulation of the Hoist Scheduling Problem, click on the DOWNLOAD BUTTON to make payment and the file will be delivered to your email immediately after confirmation.

Description

– A model-View-Controller Based Platform for the Modeling and Simulation of the Hoist Scheduling Problem –

Download A model-View-Controller Based Platform for the Modeling and Simulation of the Hoist Scheduling Problem. Students who are writing their projects can get this material to aid their research work.

Abstract

The hoist scheduling problem is a critical issue in the design and control of many manufacturing processes. When the hoist number and tank numbers are very large, finding an optimal schedule is very hard.

As a result of this, a lot of scheduling algorithms have been developed, and thus created a need to evaluate these algorithms.

This calls for a cheap and efficient way of evaluating different hoist scheduling algorithms. To address this issue, I propose a generic simulator which will be a visual tool that will be developed with Java technology.

The result of this work will help to reduce cost and also help to guarantee product quality in production lines.

Introduction

1.1 Background of the Study

The purpose of this work is to build a simulator which will have a graphical user interface that can evaluate hoist scheduling algorithms.

The Model-View-Controller (MVC) design pattern will be adopted. The simulator will simulate hoist moves of different hoist scheduling algorithms, and also evaluate these algorithms.

It also report violations of imposed constraints and also compares the algorithms to find which gives optimal scheduling. The simulator will be implemented with Java. The hoist scheduling problem (HSP) is encountered in many production lines in many industries.

This problem has been proven to be NP complete problem. Consequently many heuristic algorithms have been proposed by many researchers to solve this problem.

Problem arises on the scheduling algorithm to adopt in an automated hoist system. As a result of the numerous algorithms, there is need to have a visual tool to explore, evaluate and compare these algorithms.

How to Download this Project Material

First, note that we are one of the best and most reliable online platforms because we don’t retain any of your personal information or data as regards making payments online.

PRICE: ₦3,500 ₦3,000  (Three Thousand Naira Only)

Make a bank deposit or mobile transfer of ₦2,000 only to the account given below;


Bank Name: UBA Account Number: 1022564031 Account Name: TMLT PRO SERVICES


After making the payment, CLICK HERE to send the following on WhatsApp;

  • Depositor’s Name or Screenshot of Payment
  • Name of the Past Question
  • Active Email Address

or Call Us On +2348082284439 Once your details have been received and your payment confirmed by us, you will receive the past question in your email or WhatsApp within 5 Minutes.

Guarantee of Getting the Material 

We understand that due to the high rate of fraud, many people are afraid of making purchases online but be rest assured that PastExamQuestions will deliver your material after payment.

Once your details have been received and your payment confirmed by us, you will receive the past question in your email or WhatsApp.

Give us Feedback

Have we been able to satisfy you? How well do you think the material will be helpful after having gone through it? Does the price worth the material?

Let’s hear from you! We recommend that our customers give feedback at the end of every transaction to enable us to serve better. You can do this by clicking the review button on this page.

Where is the review button? >> Just scroll up to where you see reviews

Reviews

There are no reviews yet.

Be the first to review “A model-View-Controller Based Platform for the Modeling and Simulation of the Hoist Scheduling Problem”

Your email address will not be published. Required fields are marked *