Sale!

Design of Water Supply (Cold and Hot) System of a Three Bedroom Bungalow with Adequate Pressure

3,000.00

If you are interested in getting this project material Design of Water Supply (Cold and Hot) System of a Three Bedroom Bungalow with Adequate Pressure, click on the DOWNLOAD BUTTON to make payment and the file will be delivered to your email immediately after confirmation.

Description

Download Design of Water Supply (Cold And Hot) System of A Three Bedroom Bungalow With Adequate Pressure. Mechanical Engineering students who are writing their projects can get this material to aid their research work.

Abstract

This research is focused on the design of the water supply (cold and hot) system of a three-bedroom bungalow with adequate pressure.

Polypropylene (PP) pipes imported from Italy and polyvinyl chloride (PVC) pipes made in Nigeria, the two most common plastic materials used for potable water supply lines were selected for the analysis and compared to find out which of them is more cost-effective, provide better form-fitting and higher life expectancy.

The adequate flow pressure required for both pipes was found to be 20 Pa while the standard pipe size for the supply of both cold and hot water was found to be 19 mm.

The average diameter of branched pipes supplying water to the three-bedroom bungalow was 13 mm. For cold water supply, pipes numbers „1‟ and „2‟ had 34 loading units while pipes 3, 4, 5, 6, and 7had respectively 3.5, 6.5, 4.0, 6.5, and 13.5 loading units (LU).

The loading units for hot water supply to the building for pipes number „20‟, „21‟, „22‟, and „23‟ were respectively 4.5,4.0, 4.5, and 11.5 LU. Pipes made of PP, though more expensive, are more durable and have higher life expectancy than the PVS ones, and are resistant to weather factors such as temperature and humidity.

Introduction

Plumbing engineering responsibilities overlap into the professional areas of civil engineering, mechanical engineering, chemical engineering, and process engineering.

Traditionally, plumbing Engineering performs the calculations, sizes the equipment, and prepares the plumbing design and construction documents under the supervision of a licensed mechanical, fire protection, or professional engineer (Ho, 2010).

In most states, the mechanical engineer supervises the plumbing engineer’s responsibilities in the following areas: Design of process and fluid flow process; design of plumbing systems and design of heat energy transfer.

A water supply system uses a combination of pipes (of different dimensions and materials), valves, and outlets to deliver to the building users. Some water supply systems also use storage tanks and pumps.

Designing a water supply system involves getting all of these elements right so that clean water is delivered to the user at the appropriate rate and temperature.

How to Download this Project Material

First, note that we are one of the best and most reliable online platforms because we don’t retain any of your personal information or data as regard making payments online.

PRICE: ₦3,500 ₦3,000  (Three Thousand Naira Only)

Make a bank deposit or mobile transfer of ₦2,000 only to the account given below;


Bank Name: UBA
Account Number: 1022564031
Account Name: TMLT PRO SERVICES


After making the payment, CLICK HERE to send the following on WhatsApp;

  • Depositor’s Name or Screenshot of Payment
  • Name of the Past Question
  • Active Email Address

or Call Us On +2348082284439

Once your details have been received and your payment confirmed by us, you will receive the past question in your email or WhatsApp within 5 Minutes.

Guarantee of Getting the Material 

We understand that due to the high rate of fraud, many people are afraid of making purchases online but be rest assured that PastExamQuestions will deliver your material after payment.

Once your details have been received and your payment confirmed by us, you will receive the past question in your email or WhatsApp.

Give us Feedback

Have we been able to satisfy you? How well do you think the material will be helpful after having gone through it? Does the price worth the material? Let’s hear from you!

We recommend that our customers give feedback at the end of every transaction to enable us to serve better. You can do this by clicking the review button on this page.

Where is the review button? >> Just scroll up to where you see reviews

Reviews

There are no reviews yet.

Be the first to review “Design of Water Supply (Cold and Hot) System of a Three Bedroom Bungalow with Adequate Pressure”

Your email address will not be published. Required fields are marked *