{"id":9998,"date":"2022-07-25T04:47:27","date_gmt":"2022-07-25T04:47:27","guid":{"rendered":"https:\/\/file.currentschoolnews.com\/?post_type=product&p=9998"},"modified":"2022-07-25T08:42:24","modified_gmt":"2022-07-25T08:42:24","slug":"assessment-of-professionals-perception-on-materials-management-practices-on-construction-sites-in-selected-states-in-nigeria","status":"publish","type":"product","link":"https:\/\/pastexamquestions.com\/product\/assessment-of-professionals-perception-on-materials-management-practices-on-construction-sites-in-selected-states-in-nigeria\/","title":{"rendered":"Assessment of Professional\u2019s Perception on Materials Management Practices on Construction Sites in Selected States in Nigeria\u00a0"},"content":{"rendered":"

– Assessment of Professional\u2019s Perception on Materials Management Practices on Construction Sites in Selected States in Nigeria\u00a0 –<\/strong><\/span><\/p>\n

Download Assessment of Professional\u2019s Perception on Materials Management Practices on Construction Sites in Selected States in Nigeria<\/strong><\/span>. Building students who are writing their projects can get this material to aid their research work.<\/span><\/span><\/p>\n

Abstract<\/b><\/span><\/h2>\n

Construction materials usually constitute a major portion of the total cost in building construction project. An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. <\/span><\/p>\n

This research studied the Professional\u2019s Perception on Materials Management Practices on Construction Sites in selected states in Nigeria by the use of structured questionnaires administered to senior\u00a0<\/span>construction professional<\/span>\u00a0personnel of construction firms. <\/span><\/p>\n

The data generated were analyzed using descriptive statistics. 62% response rate was achieved and used for analysis. <\/span><\/p>\n

The study showed that the factors militating against materials management contributes to delay in completion time of project such as storage of materials on site with mean value (4.9), incompetence of estimators (4.8), issuing of materials for use (4.7) and procurement for materials (4.6).<\/span><\/p>\n

\"\"<\/a><\/span><\/p>\n

Introduction<\/span><\/span><\/strong><\/span><\/h2>\n

Material management can be defined as a process that coordinates planning, assessing the requirement, sourcing, purchasing, transporting,<\/span><\/p>\n

storing and controlling of materials, minimizing the wastage and optimizing the profitability by reducing cost of material.<\/span><\/p>\n

\u00a0<\/span>Baldva<\/span>\u00a0(1997) noted that Materials management is a process for planning, executing and controlling field and office activities in construction. <\/span><\/p>\n

While Eduardo (2002) viewed Materials management as the system for planning and controlling all of the efforts necessary to ensure that the correct quality and quantity of materials are properly specified in a timely manner, are obtained at a reasonable cost and most importantly are available at the point of use when required.<\/span><\/p>\n

\"\"<\/a><\/span><\/p>\n

How to Download this Project Material<\/strong><\/span><\/h2>\n

First, note that we are one of the best and most reliable online platforms because we don\u2019t retain any of your personal information or data as regards making payments online.<\/span><\/p>\n

PRICE: <\/strong>\u20a63,500<\/b><\/del><\/span> \u20a63,000\u00a0 (Three Thousand Naira Only)<\/b><\/span><\/h2>\n

\"\"<\/a><\/span><\/h2>\n

Make a bank deposit or mobile transfer of \u20a62,000\u00a0<\/strong>only to the account given below;<\/span><\/p>\n


\n

Bank Name:<\/b>\u00a0UBA Account Number:<\/b>\u00a01022564031 Account Name:<\/b>\u00a0TMLT PRO SERVICES<\/span><\/p>\n


\n

After making the payment,\u00a0CLICK HERE\u00a0<\/strong><\/a>to send the following on WhatsApp;<\/span><\/p>\n